Mission Series-manufacture,factory,supplier from China
(Total 24 Products for Mission Series)
IntroductionIt is the first joint venture plant in internal combustion industry of China and also the biggest heavy duty and high horse-power engine(maximum displacement from 11L to 50L)producer and seller as well as with the largest customer population in this area. The prime products include Cummins M11,NT855,QSN,K19,K38,OSK19,QSK38 and K50 engine series,with the engine varying from 175-2200hp.ParameterGenset ModelOutputEngine ModelPrime Power KVA/KW Standby Power KVA/KW 50HZ,1500rpm,cosφ=0.8 400V1HL200GF
Contact Now
ParameterMITSUBISHl Genset ModelOutputEngine ModelPrime Power KVA/KW Standby Power KVA/KW 50HZ,1500rpm,cosφ=0.8 400V1HL24GF30/2433/26.4S4S2HL500GF625/500687.5/550S6R-PTA3HL540GF675/540742/594S6R2-PTA4HL850GF1062/8501168/935S12H-PTA5HL1020 GF1275/10201402/1122S12R-PTA6HL1100GF1375/11001512/1210S12R-PTA260HZ,1800rpm,cosφ=0.8 480V1HL540GF675/540742/594S6R-PTA2HL800GF1000/8001100/880S12H-PTA3HL912GF1140/9121255/1004S12H-PTA4HL 1352GF1690/13521860/1487S12R-PTAA25HL1452GF1815/14522000/1600S16R-PTA6HL1636GF2045/16362250/1800S16R-PTA2CompanyOur company do have the adva
Contact Now
IntroductionGenerators are widely used in industrial and agricultural production, national defense, science and technology, and daily life.
Contact Now
IntroductionGenerators are widely used in industrial and agricultural production, national defense, science and technology, and daily life.
Contact Now
ParameterGenset ModelOutputEngine ModelPrime Power KVA/KW Standby Power KVA/KW 50HZ,1500rpm,cosφ=0.8 400V1HL144GF180/144 200/1601106C-E66TAG42HL200GF250/200 275/2201306C-E87TAG63HL364GF455/364 500/4002506A-E15TAG14HL480GF600/480 660/5282806A-E18TAG1A5HL600GF750/600 825/6604006-23TAG2A6HL800GF1000/8001100/8804008TAG2A60HZ,1800rpm,cosφ=0.8 480V1HL165GF206/165227/1821106C-E66TAG42HL250GF313/250344/2751606A-E93TAG43HL455GF569/455626/5002506A-E15TAG44HL600GF750/600825/6604006-23TAG2A5HL800GF1000/8001100/8804008TAG26HL1100GF1375/11001513/12104012-
Contact Now
In order to guarantee the continuous durability of the engine and prolong quality life,renewable cylinder liner,valve retainer and pipe are adopted.In this way the maintenance service can be easy.There are processional after-sales service team,plenty of spare parts and timely technical support in Doosan to make the customers more satisfied with its productions.ParameterDOOSAN Genset ModelOutputEngine ModelPrime Power KVA/KW Standby Power KVA/KW 50HZ,1500rpm,cosφ=0.8 400V1HL96GF120/9
Contact Now
IntroductionIntelligent maintenance system is installed in the generator set,all kinds of detection sensor are installed in all the major parts,386 parameters can be recorded in the ADEC electronic management system automatically as long as the generator set runs. The fault is shown by digital,the current fault and the past fault can be also picked out automatically.MTU is the longest-lived engine and the first overhaul of the engine can be reached 24000-30000 hours,It is the unique engine with so long overhaul and it equals to the 10 times of
Contact Now
IntroductionA generator set is a complete set of mechanical equipment that converts other forms of energy into electrical energy.
Contact Now
IntroductionA generator set is a complete set of mechanical equipment that converts other forms of energy into electrical energy.Generators are widely used in industrial and agricultural production, national defense, science and technology, and daily life.ParameterSHANGCHAI & NANTONG Genset ModelOutputEngine ModelPrime Power KVA/KW Standby Power KVA/KW SHANGCHAI 50HZ,1500rpm,cosφ=0.8 400V1HL180GF225/180247/198G128ZLD2HL200GF250/200275/220G128ZLD23HL280GF350/280385/308G128ZLD114HL300GF375/300412.5/33012V135AZD5HL400GF500/400550/44012V135BZLD26HL4
Contact Now
Use low speed two stage screw compressor (1500 RPM), lower noise, higher efficiency. High efficient permanent magnet motor, whether light load or heavy load, the efficiency can be always maintained above 95%. Advanced microcomputer control drive system is adopted to realize intelligent control and variable speed control air flow automatically;132 CeT-6 132:Electric motor power 132kW C:Cement dedicated series e:Various frequency T:Two-stage compression -6:Rated pressure 6bar 132 CeT-6ParameterElectric motor powerDischarge air volume FADWork pressure55-250 kW3.
Contact Now
Product Description :Middle-Low Air Pressure DTH HammerCBR1, CBR2 and CBR3 series DTH Hammers are designed to operate efficiently at low air pressures and medium air pressures, using BR series bits.Parts Description Weight/KgPart Number1Top Sub 2.6CBR2-012Check Valve 0.1CBR2-023Spring&nbs
Contact Now
This model is the classic product series of separated drill rigs of JS DRILL,and with full function design of super intensity and high-level configuration,is approved by many users.ProductProduct Parameters: Hole Depth 30 m Drill Pipe Sizes φ76mm×3,000 mm Hole Dia φ110-165 mm DTH Hammer 4"/5” Rotation Torque(Max.) 3,500 N.m Rotation Speed 0-100 rpm Working Pressure 0.7-2.5 Mpa F.A.D 10-20 m³/min Feed Force 20 kN Pu
Contact Now
Based on the principle of thermal compression, the total efficiency is more than 75%, more than 20~35% energy saving than Roots blower, more stable discharge and lower pressure pulse. intelligent PLC control, remote control, multi-communication, simplified operation management. Low noise design, discharge muffler device, no need to install additional muffler device. Labyrinth seal + carbon ring seal combination to realize the oil and air isolation between the compression chamber and the lubricating chamber, to ensure that the air is 100% oil-free.22
Contact Now
Our product has large heat exchange area cooler with high cooling efficiency and adapt to wider ambient temperature and prolong life.55 SFeT-755:Electric motor power 55kW S:Screw F: Air cool-7:Rated pressure 7bar e:Various frequency T:Two-stage compression 55 SFeT-7ParameterElectric motor powerDischarge air volume FADWork pressure55-132 kW4.7-27.0 m³/min7 barModelElectricmotor powerAir dischargecapacity FADRated speedWeightDimensions(LxWxH)Air dischargevalve size55SFeT-755 kW4.7-11.78 m³/min1500 RPM1650 kg2160×1310×16
Contact Now
The JS DRILL products are widely used in industry compressed air supply, mining and construction projects.
Contact Now
When used in the construction and mining industries, air compressors are widely used in coal mines, mining, tunnel construction, road construction and other pneumatic tool fields. With technology development as the heart of company's philosophy, JS Drill follows the guidelinesof «detail oriented, high efficiency, quality enhasment and creating innovation». JS Drill is aiming the global market with world class products and services and is constantly innovating ways to move forward to help the rise of Chinese international machinery and equipment manufacturing indust
Contact Now
When used in the construction and mining industries, air compressors are widely used in coal minesmining, tunnel construction, road construction and other pneumatic tool fields. Due to the harsh operating environment, air compressors need to be durable. Air compressors stand out from many similar products with their excellent durability.With technology development as the heart of company’s philosophy, JS Drill follows the guidelinesof «detail oriented, high efficiency, quality enhasment and creating innovation». ParameterNumber CSH1120A-31DCSH1300A-34DCSH1320A-34D1Compresso
Contact Now
Various processes such as mud positive circulation drilling rig,pneumatic down-the-hole hammer drilling,air-generating circulation drilling rig,and hydraulic DTH hammer drilling rig can be selected according to the construct ion needs of customers.Product Parameters:NameModelParameterCar ChassisSpecial ChassisSinotruk SINOTRUK 6X4 ,290HP RigTower bearing capacity: 35t Two hydraulic cylinders Oil cylinder rig height: 6M Lift Feed Cylinder Feeding force: 12TLifting force: 25T Hydraulic Outriggers Four hydraulic outriggersDrilling PowerEquipped With Hydraulic Triangular Valve To Av
Contact Now
Inverter starting avoids grid shocks, intelligent inverter air pressure control reduces energy-intensive run times, and precise constant voltage control maintains system pressure deviations within 0.1 bar.WHY CHOOSE US -1. We have many years of production and management experience2. We have our own professional testing equipment3. We can provide OEM&ODM custom services4. Provide complete solution for our clients5. Packaging and transportation professional designer team37 SFe-8ParameterElectric motor powerDischarge air volume
Contact Now
PartsWeight /kgPartsWeight /kg1 Top Sub12.7 Kg 9 Guided Sleeve3 Kg2 "O"Ring0.01 Kg 10 Retainer Ring0.7 Kg3 Check Valve0.6 Kg 11 "O"Ring0.01 Kg4 Spring0.06 Kg 12 Drive Chuck5.3 Kg5 Valve Seat1.7 Kg 13 Drill Bit6 Inner Cylinder2.9 Kg7 Piston12 Kg8 Piston Case23 KgTechnical parametersLength(Less bit)Weight Outer diameterConnection ThreadBit ShankHole Range1080mm 62Kg114mm API2 3/8"REGNM5C 125-146 mmWorking PressureRecommended Rotation SpeedAir Consumption1.
Contact Now
PartsWeight /kgPartsWeight /kg1 Tup Sub274 Kg13Rigid Valve0.3 Kg2 Adjuster Shim2.9 Kg14 Rubber Buffer0.3 Kg3 "O"Ring0.03 Kg15 "O"Ring0.03 Kg4 Check Valve3.4 Kg16 Pole seat50 Kg5 Spring0.3 Kg17 "O"Ring0.03 Kg6 Regulate ring1.5 Kg18 Piston347 Kg7 Disc Sping1.35 Kg19 Piston Case562 Kg8 Disc Sping1.35 Kg20 Check Ring0.3 Kg9 Disc Sping1.35 Kg21 Retainer Ring10 Kg10 Disc Sping1.35 Kg22 Adjuster Shim2.9 Kg11 Valve Seat26.4 Kg23 Driver Chuck155 Kg12 RubberBuffer0.
Contact Now
JS416 is configured with a powerful dual-motor driven rotary head and its rotary torque can reach 1,950N.m,and its rotary speed is adjustable combined with a multi-way regulating valve.Product Parameters:Drill Pipe Sizes φ60×3,000 mmDrill Pipe Dia φ90-127 mmRotation Torque(Max) 1,950 N.mRotation Speed 0-150 rpmFeed Force 15 kNPull Up Force 25 kNFeeding Type Hydraulic cylinder-chainTramming Speed (Max.) 2.5 km/hGradient 25°Total Weight 4,500 kg/4,250 kgTransportation Dime
Contact Now
ParametersModel60SCY-7110SCY.10141SCY-12-15China IV engine(standard)Xichai/55 kWYuchai/118 kWYuchai/140 kWDiesel tank volume85 L135 L230 LAir EndSingle Stage CompressionRated FAD9 m³/min12.5 m³/min18/15 m³/minRated Pressure7 bar10 bar12/15 barWeight1.280 kg2,350 kg2.600 kgType2 wheel4 wheel4 wheelDimensions (LxWxH)2,700×1,600×1,700 mm3,000×1,610×2,350 mm3,250×1,610×2,470 mmCompanyWe established in 2018and is located in shandong jining province ,enjoying convenient transportation and beautiful environment.Our company covers an area of 600 square meters and
Contact Now
Use high efficienct air end, large rotor, low rpm, low noise, low vibration, low energy consumption. Independent oil pump forced lubrication; ensure sufficient oil injection at very low discharge pressure to make stable operation;37 SFeD-1.5 37:Electric motor power 37kW S: Screw F:Air cool -1.5: Rated pressure 1.5bar e:Various frequency D:low pressure 无 T:Single-stage compression37 SFeD-1.5ParameterElectric motor powerDischarge air volume FADWork pressure37-110 kW13.9-46.0 m³/min1.5 barModelElectricmotor powerAir dischargecapacity FADRated spee
Contact Now
Relate News
If you need a drill rig for various purposes such as drilling a well to obtain natural resources (water, oil, geothermal energy, etc.) building a foundation, drilling holes in a mine, taking samples from the ground.It is necessary to first determine the purpose of the drilling rig and what kind of terrain it will mainly operate on. Depending on the terrain, you can choose different types of drilling rigs: rotary drilling rigs, impact drilling rigs, down-the-hole drilling rigs, top hammer drilling rigs (with high hammer), etc.
1. What is the warranty of our machine?Our main machine enjoys a 1 year warranty(except for the hammer), during this time all accessories broken can be changed for a new one.And we provide videos for machine install and operation.2. What is your terms of packing?Generally, we use standard exported wooden case for LCL goods, and fixed well for FCL goods.
For the construction machinery industry, its development mainly has the following three characteristics:1. Industry development is closely related to national macroeconomic developmentFor the construction machinery industry, the development of the industry is closely related to the development of downstream demand markets. The development of downstream industries such as the real estate industry, infrastructure industry, power industry, and coal industry has a high impact on the growth of demand for various types of construction machinery and equipment. Relevance.
Drilling rig is a complex machine, which consists of machines, units and mechanisms. A drilling rig is a mechanical device that drives drilling tools to drill underground to obtain physical geological data during exploration or development of mineral resources (including solid minerals, liquid minerals, gas minerals, etc.). Also called drilling machine. The main function is to drive the drilling tool to break the rock at the bottom of the hole, and to lower or lift the drilling tool in the hole. It can be used to drill rock cores, ore cores, cuttings, gaseous samples, liquid samples, etc.
Zoucheng Jusheng Mining Machinery Co., Ltd. (Shandong) was established in 2 0 1 8. The company's annual sales are more than 1 5 million US dollars. Before the establishment of the company, we have 1 5 years of experience in equipment sales and service. As one of the excellent authorized agents of ZEGA brand mining machinery, we supply ZEGA brand mining rigs and air compressors to global customers. At present, JS Drill has reached long-term cooperation with customers in more than 5 0 countries around the world.
A customer from Puerto Rico in the United States asked our company to customize a 200-meter crawler water well drilling rig with diesel power generation/61kw.First, we will draw a rough model according to the customer's requirements, and then the designer will make a prototype based on the graphics. Now it has been made for the customer.
The factory has become busy recently. As the number of customers gradually increases, so do the orders. However, we will still strictly control product quality so that customers can rest assured. The service quality will also increase accordingly.
Visiting a construction site abroad1 Visiting processSafety training:Before entering the construction site, I received a safety training. The training content may include safety regulations of the construction site, emergency response measures, correct use of personal protective equipment, etc.Listen carefully to the safety training, comply with the safety regulations of the construction site, and ensure your own safety.2 Site tour:The site staff will lead the tour.
1. What is your terms of delivery?EXW, FOB, CFR, CIF.We have a very good cooperation in shipping logistics, and the price is low.Not only our product price is advantageous, but also our logistics price. 2. How about your delivery time?Generally, it will take 7-10 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order. We have the goods in stock and they will be shipped from the factory within three days.
What is your terms of payment? T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.