260m 300m Truck Mounted Water Well Drilling Rig

Features

1 The drilling system is integrated in the chassis of a heavy-duty truck, and the site switching is completed in 2 hours, reducing the cost of site transfer in mountainous areas by 40%

2 The comprehensive fuel consumption is reduced by 25%, and the endurance of deep operation is increased to 18 hours

3 The replacement time of core components is compressed to 45 minutes


Contact Now E-Mail Telephone WhatsApp
Product Details

Advantages

1 The daily footage efficiency is increased by 35%, the comprehensive cost of a single hole is reduced by 22%, and the annual utilization rate of equipment exceeds 85%

2 Equipped with a remote diagnosis system, the key components have an extra-long warranty of one year, making exploration investment more certain

3 The deviation rate of the 300-meter hole depth is ≤1.5°, ensuring accurate coring in complex formations.



Product Show

Product Show





Parameters


Weight (T) 

9

Hole diameter (mm) 

140-325

Drilling depth (m) 

300

One-time advance length (m)

3.3 / 4.8

Walking speed (km/h) 

2.5

Climbing angles (max.)

30

Equipped capacitor (kw)

85

Using air pressure (MPA)

1.7 - 3.0

Air consumption (m³/min)

17 - 36

Swing speed (rpm)

40-70

Penetration efficiency (m/h)

15 - 35

Drill pipe diameter (mm)

Ø76 Ø89 Ø102

Drill pipe length (m)

 1.5 / 2.0 / 3.0

Rig lifting force (T)

18

Rapid rise speed (m/min)

22

Fast feeding speed (m/min)

40

Width of loading (m/min)

2.7

Hoisting force of winch (T)

2

Swing torque (N.m)

5700 - 7500

Dimension (mm)

6600×2200×2800

Equipped with hammer

medium and high air pressure series

High leg stroke (m)

1.4





Company

company  company



Values

Zoucheng Jusheng Mining Machinery Co., Ltd. adheres to the values of integrity, innovation, cooperation, and win-win, and runs through the company's business management and employees' daily work. These values are not only the company's code of conduct, but also an important force for the company to unite people and stimulate employees' creativity.

Team Building

The company pays attention to team building and improves the professional skills and comprehensive quality of employees through various training and activities. The company also creates a good working atmosphere, encourages employees to cooperate and support each other, and contribute to the development of the company.





Packaging

Packaging  Packaging





Factory Tour

Factory Tour  Factory Tour





Exhibition

Exhibition  Exhibition


Exhibition





Q&A


1.How about your delivery time?

Generally, it will take 7-10 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.


2.What is the warranty of our machine?

Our main machine enjoys a 1 year warranty, during this time all accessories broken can be changed for a new one.And we provide videos for machine install and operation.


3.What is your terms of packing?

Generally, we use standard exported wooden case for LCL goods, and fixed well for FCL goods.


4.Do you test all your goods before delivery?

Yes, we have 100% test before delivery.And we will attach our inspect report for every machine.


5.Do you Preferred provide wear parts for transacted clients?

Yes, we have records for your clients, and will prefer providing accessories to clients.




Leave your messages

Related Products

x

Popular products

x
x