110SCY

Feature

Screw Air End

Patented rotor profile,highest efficiency, heavy-duty design, direct drive,

principle energy saving, innovative design

Diesel Engine

Equipped withYuchai, Cummins and other heavy-duty special diesel engines to

achieve the best combustion state in the whole range of engine operation,

the product has higher reliability,stronger power, and better fuel economy.


Contact Now E-Mail Telephone WhatsApp
Product Details


Parameters


Model

60SCY-7110SCY.10141SCY-12-15

China IV engine(standard)

Xichai/55 kW

Yuchai/118 kW

Yuchai/140 kW

Diesel tank volume

85 L

135 L

230 L

Air End

Single Stage Compression

Rated FAD

9  m³/min

12.5  m³/min

18/15  m³/min

Rated Pressure

7 bar

10 bar

12/15 bar

Weight

1.280 kg

2,350 kg

2.600 kg

Type

2 wheel

4 wheel

4 wheel

Dimensions (LxWxH)

2,700×1,600×1,700 mm

3,000×1,610×2,350 mm

3,250×1,610×2,470 mm




Company

Company




We established in 2018and is located in shandong jining province ,enjoying convenient transportation and beautiful environment.Our company covers an area of 600 square meters and has 20 employees. We are specialized in import and export;technology import and export.Our company has rich experience in the engineering and building materials machinery industry.

 

Before the establishment of the company, we have 15 years of experience in equipment sales and service and have more than  1 5 years of experience in design and manufacturing , mainly producing water well drilling rigs, DTH drilling tools, air compressors,and so on.



Packaging & Shipping:

Packaging



Packaging




Exhibition:

Exhibition


Exhibition


Exhibition



FAQ

1 What is your terms of delivery?

EXW, FOB, CFR, CIF.We have a very good cooperation in shipping logistics, and the price is low.Not only our product price is advantageous, but also our logistics price.

 

2 How about your delivery time?

Generally, it will take 7-10 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

We have the goods in stock and they will be shipped from the factory within three days. We will book the warehouse after you pay the advance payment. 


Leave your messages

Related Products

Popular products

x

Submitted successfully

We will contact you as soon as possible

Close